Skip to main content
JobPin
Find jobsJob fairsResourcesAlertsSaved (0)Account
WarehouseDeliveryDrivingRetailCustomer serviceHealthcareGeneral laborRemote
SearchSaved (0)AlertsAgent

Explore JobPin

Home / Resources / Data Center Construction Jobs: Where the Projects Are, Which Trades They Hire, and What They Pay

Trades and data center construction

Data Center Construction Jobs: Where the Projects Are, Which Trades They Hire, and What They Pay

Data center campuses need thousands of trade workers at peak: Meta expects 7,500 in Louisiana (LED, July 2026), Microsoft over 6,000 in Pecos, Texas (Microsoft, June 2026). Electricians, laborers, operating engineers and pipefitters build them. Confirmed projects, pay by metro, and entry points below. Last reviewed October 19, 2026.

Edited by JobPin editorial team · Reviewed October 19, 2026

In this guide
  • The biggest campuses, in the companies' own words
  • What the trades earn in data center metros
  • Which trades the projects hire
  • Union locals that run the apprenticeships
  • How to start with no trade experience
  • Current openings
  • How to verify a listing

The biggest campuses, in the companies' own words

Scroll horizontally to view every column.

Site Company What was stated Date and source
Richland Parish, LA Meta More than $50 billion; 7,500 construction jobs at peak; about 1,000 operational jobs Louisiana Economic Development, July 13, 2026
Pecos, TX Microsoft About 2 gigawatt campus; "over 6,000 construction jobs at peak build-out"; hundreds of permanent jobs Microsoft blog, June 22, 2026
Mount Pleasant, WI Microsoft More than 3,000 construction workers at daily peak; nearly 10,000 over two years; second building due 2028 Microsoft, September 18, 2025; June 23, 2026
Abilene, TX (Stargate I) OpenAI and Oracle "Thousands of jobs," including electricians, equipment operators and technicians from more than 20 states OpenAI, July 22, 2025
Shackelford County TX, Dona Ana County NM, Port Washington WI, Abilene expansion OpenAI, Oracle "Over 25,000 onsite jobs" across these sites; Lordstown OH and Milam County TX added with SoftBank OpenAI, September 23, 2025
Armstrong and Haskell counties, TX Google $40 billion through 2027; training for more than 1,700 electrical apprentices in Texas by 2030 Google, November 14, 2025
Salem Township and Falls Township, PA Amazon At least $20 billion; 1,250 high-skilled jobs; "thousands of construction jobs" Pennsylvania governor's office, June 9, 2025
St. Joseph County, IN AWS $11 billion; at least 1,000 jobs; campus built "over the next decade" Indiana Economic Development Corporation, April 25, 2024
Madison County, MS AWS $10 billion; at least 1,000 jobs; $11 billion more added April 9, 2026 Mississippi Development Authority, January 25, 2024; governor's office, April 9, 2026

What the trades earn in data center metros

Hourly medians: BLS OEWS, May 2025. Meta peak counts: Meta locations page, read October 2026.

Scroll horizontally to view every column.

Metro Electricians Laborers Operating engineers Confirmed projects in the metro
U.S. (national) $30.38 $22.66 $28.78
Washington-Arlington-Alexandria $36.50 $22.80 $29.64 Google, Loudoun and Prince William counties (June 11, 2026); AWS $35 billion statewide by 2040 (VEDP, January 20, 2023)
Richmond, VA $29.50 $20.39 $26.58 Google, new Chesterfield County center in a $9 billion plan through 2026 (August 27, 2025); Meta Henrico, 1,500 at peak
Columbus, OH $31.11 $29.11 $37.96 Microsoft Licking County, 3 campuses, 350 construction roles a year through 2029 (June 2026); Meta New Albany, 1,200 at peak; AWS $7.8 billion in Central Ohio (JobsOhio, June 26, 2023)
Dallas-Fort Worth $28.37 $21.14 $24.70 Meta Fort Worth, $1.5 billion or more, 1,200 at peak
Phoenix-Mesa $29.43 $22.56 $30.07 Meta Mesa, $1 billion or more, 2,000 at peak; Microsoft in El Mirage and Goodyear (Microsoft Local, read October 2026)
Atlanta $28.20 $20.20 $23.77 Meta Stanton Springs, 1,300 at peak; Microsoft Fairwater Atlanta, in operation since October 2025 (November 12, 2025)
San Antonio $27.41 $18.94 $23.44 Microsoft, Bexar and Medina counties, about 530 operations employees (fact sheet, October 2025)
Kansas City $36.95 $24.28 $30.80 Meta Kansas City, $1.2 billion or more, 1,500 at peak
Des Moines $30.21 $24.03 $30.10 Meta Altoona, $2.5 billion or more, 1,300 at peak; Microsoft West Des Moines, about 540 employees (fact sheet, October 2025)
Omaha $30.02 $23.22 $28.86 Meta Sarpy County, $2.5 billion or more, 1,300 at peak; Google, more than $15 billion in Nebraska since 2019 (datacenters.google)
Reno $35.00 $24.63 $35.22 Google Storey County, built 2021, part of more than $6 billion in Nevada (datacenters.google)
Salt Lake City $30.11 $22.82 $29.69 None confirmed inside the metro
Portland-Hillsboro $50.53 $26.08 $38.00 None confirmed inside the metro

More: pay benchmarks for hourly jobs.

Which trades the projects hire

The companies name the trades:

  • Microsoft, Mount Pleasant: "electricians, plumbers and pipefitters, carpenters, structural iron and steel workers, concrete workers, and Earth movers" (Microsoft, September 18, 2025).
  • OpenAI, Abilene: "specialized roles for electricians, equipment operators, and technicians" (OpenAI, July 22, 2025).
  • Amazon, Northern Indiana: "thousands of local electricians, construction workers, and fiber-optic technicians" (aboutamazon.com, read October 2026).

National medians, May 2025: helpers of electricians $20.51 an hour, construction laborers $22.66, structural iron and steel workers $30.18, plumbers and pipefitters $30.67 (BLS OEWS).

Union locals that run the apprenticeships

A joint committee (JATC) of an IBEW local and the NECA contractors' chapter runs each union electrical apprenticeship. Five, read on their own sites in October 2026:

  • Washington, DC area: IBEW Local 26, JATC in Lanham, MD. Inside wireman apprentices do at least 8,000 hours on the job at 45 to 80 percent of the journeyman rate, $62.00 an hour as of June 1, 2026 (jatc26.org).
  • Dallas-Fort Worth: IBEW Local 20, North Texas Electrical JATC in Grand Prairie. Apprentices start at $20.33 an hour plus $2.91 in insurance and retirement (ibew20.org).
  • Phoenix: IBEW Local 640, Phoenix Electrical JATC. Online application, $40 fee; Inside Electrician deadline for the Fall 2027 class is March 15, 2027 (pejatc.org).
  • Atlanta: IBEW Local 613, Atlanta Electrical JATC. Applications reopen May 1 to 31, 2027 (aejatc.org).
  • Columbus: IBEW Local 683, Electrical Trades Center. Online application, $50 fee, aptitude test (electricaltrades.org).

Laborers train through LIUNA, which lists more than 80 training centers in the U.S. and Canada (liunatraining.org, read October 2026). Pipefitters train through United Association locals; programs "typically last five years" (ua.org, read October 2026). Details: electrician apprenticeship and HVAC apprenticeship.

How to start with no trade experience

  1. Laborer. No formal education is required; most learn on the job (BLS OOH, August 2026). See construction laborer: your first job and general labor entry points.
  2. Helper. Helpers carry materials and set up for a trade. BLS notes "an electrician's helper might earn a high school equivalency to enter an electrician apprenticeship" (BLS OOH, August 2026).
  3. Pre-apprenticeship. Amazon lists a paid "AWS Information Infrastructure Pre-Apprenticeship" at its Pennsylvania and Indiana campuses, ending in "a guaranteed interview with AWS or one of our contractors" (aboutamazon.com, read October 2026).
  4. Apprenticeship. A registered program must give at least 2,000 hours of on-the-job learning and a "progressively increasing schedule of wages" (29 CFR 29.5). Google is funding training for "more than 1,700 apprentices in Texas by 2030" (Google, November 14, 2025).

Microsoft's Datacenter Academies train for operations and IT roles, not construction (Microsoft, September 18, 2025). See also jobs that pay $20 an hour with no degree.

Current openings

See general labor jobs nationwide, or by city: Phoenix, Denver. Also warehouse jobs in Dallas and jobs with weekly pay.

More general labor openings

Current source-linked listings could not be confirmed in this sample. Check the category search and each original posting for availability.

Browse general labor jobs

How to verify a listing

Every opening on JobPin links to its source posting. Check that the posting names the contractor, the site and the pay rate. No legitimate contractor charges a fee to apply. How we check: how JobPin verifies listings.

How JobPin dates and sources listings: How JobPin verifies listings and events. Report a listing.

FAQ

Which states have the most data center construction right now?

Every state in the table above has a campus with a company-stated job count. The largest stated peak is Meta's 7,500 construction jobs in Richland Parish, Louisiana (Louisiana Economic Development, July 13, 2026).

Can I get a data center construction job with no experience?

Yes, as a laborer or helper. Construction laborers need no formal education and typically learn on the job (BLS OOH, August 2026).

What do electricians make on these projects?

BLS does not publish pay by project. Electrician metro medians in May 2025 ran from $27.41 in San Antonio to $50.53 in Portland (BLS OEWS). DC-area apprentices earn 45 to 80 percent of a $62.00 journeyman rate (jatc26.org, June 1, 2026).

Do I apply to Microsoft, Meta or Amazon?

No. Crews are hired by general contractors and subcontractors. Meta names Turner, DPR and Mortensen as its Louisiana general contractors (Meta, December 19, 2025).

How long does a data center build last?

Years. Meta expects Louisiana construction "through 2030" (LED, December 4, 2024); AWS's Indiana campus is built "over the next decade" (IEDC, April 25, 2024).

Is the work union?

Sometimes. Wisconsin's governor described Microsoft's project as "bringing thousands of union construction jobs to the area" (September 18, 2025).

Where do I find an apprenticeship near a project?

Use the Apprenticeship Job Finder on apprenticeship.gov or the local JATC above. Windows are short; Atlanta's is May 1 to 31, 2027 (aejatc.org).

Last reviewed: October 19, 2026 by JobPin editorial team.

Sources

  • LED, Meta $50 billion (July 13, 2026): https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history
  • LED, Meta selects Richland Parish (December 4, 2024): https://www.opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state
  • Meta, Richland Parish one year in (December 19, 2025): https://about.fb.com/news/2025/12/metas-richland-parish-data-center-supports-louisiana-economy-875-million-in-contracts/
  • Meta data center locations: https://datacenters.atmeta.com/us-locations/
  • Microsoft, Pecos datacenter (June 22, 2026): https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/
  • Microsoft, Made in Wisconsin (September 18, 2025): https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/
  • Microsoft, Mount Pleasant complete (June 23, 2026): https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/
  • Wisconsin governor, Microsoft $4 billion (September 18, 2025): https://content.govdelivery.com/accounts/WIGOV/bulletins/3f327b5
  • Microsoft, Atlanta Fairwater (November 12, 2025): https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/
  • Microsoft Local, Licking County economic impact (June 2026): https://local.microsoft.com/wp-content/uploads/2026/06/Economic-Impact_LickingCountyOH_FY26Q4.pdf
  • Microsoft Local, Texas fact sheet (October 2025): https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf
  • OpenAI, Stargate 4.5 GW with Oracle (July 22, 2025): https://openai.com/index/stargate-advances-with-partnership-with-oracle/
  • OpenAI, five new Stargate sites (September 23, 2025): https://openai.com/index/five-new-stargate-sites/
  • Google, $40 billion in Texas (November 14, 2025): https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-texas/
  • Google, $9 billion in Virginia (August 27, 2025): https://blog.google/inside-google/company-announcements/google-american-innovation-virginia/
  • Google, Virginia community investments (June 11, 2026): https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/virginia-community-investments/
  • Google data centers, Nebraska and Nevada: https://datacenters.google/locations/nebraska/
  • Pennsylvania governor, Amazon $20 billion (June 9, 2025): https://www.pa.gov/governor/newsroom/2025-press-releases/gov-announces-amazon-to-invest--20b-in-pa--largest-capital-inves
  • Amazon, Pennsylvania investment and pre-apprenticeship: https://aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation
  • Amazon, $15 billion in Northern Indiana: https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers
  • IEDC, AWS $11 billion (April 25, 2024): https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana
  • MDA, AWS $10 billion (January 25, 2024): https://mississippi.org/news/amazon-web-services-to-invest-record-shattering-10-billion/
  • Mississippi governor, Amazon $25 billion (April 9, 2026): https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/
  • JobsOhio, AWS $7.8 billion in Central Ohio (June 26, 2023): https://www.jobsohio.com/newsroom/news-press/amazon-web-services-plans-to-invest-an-estimated-7-8-billion-in-ohio
  • VEDP, AWS $35 billion by 2040 (January 20, 2023): https://www.vedp.org/press-release/2023-01/amazon-web-services-2023
  • IBEW Local 26 JATC, inside wireman program: https://www.jatc26.org/?p=149
  • IBEW Local 20, apprenticeship program: https://www.ibew20.org/apprenticeship-program
  • Phoenix Electrical JATC, how to apply: https://www.pejatc.org/how-to-apply
  • Atlanta Electrical JATC: https://sites.google.com/aejatc.org/etc
  • Electrical Trades Center (IBEW Local 683): https://www.electricaltrades.org/application-process/
  • LIUNA Training and Education Fund: https://www.liunatraining.org/
  • United Association apprenticeship: https://ua.org/apprenticeship/
  • 29 CFR 29.5, standards of apprenticeship: https://www.ecfr.gov/current/title-29/subtitle-A/part-29/section-29.5
  • BLS OOH, construction laborers and helpers (August 27, 2026): https://www.bls.gov/ooh/construction-and-extraction/construction-laborers-and-helpers.htm
  • BLS OEWS, May 2025: https://www.bls.gov/oes/

Related

  • Electrician Apprenticeship: How to Apply, What It Pays While You Learn, and How Long It Takes
  • Construction Laborer: Your First Job on a Site, Pay, Safety Training, and the Path to a Trade
  • HVAC Apprenticeship: Paid Training Paths, EPA 608 Certification, and Pay by Metro
  • General Labor Jobs: Entry Points Into Construction, Warehousing, Landscaping and Events, and What Each Pays
JobPin

Find openings, save your shortlist, and prepare for the next step.

JobPin is operated by InboxSuite Inc. hello@jobpin.net

Find jobs

+
  • Find Jobs
  • Job Fairs
  • Warehouse Jobs
  • Remote Jobs
  • Retail Jobs
  • Customer Service Jobs

Job tools

+
  • Resources
  • Alerts
  • Saved Jobs
  • AI Agent
  • SMS Alerts
  • SMS Opt-Out

Prepare

+
  • Resume Tips
  • Interview Prep
  • Application Tracker
  • Hiring Now Guide
  • How JobPin Works

Company & help

+
  • About
  • How We Verify Listings
  • Contact
  • Accessibility
  • Advertising Disclosure
  • Privacy
  • Terms
  • Data Rights

© 2026 JobPin — Pin your next paycheck. A service of InboxSuite Inc.

Reply STOP to opt out of SMS alerts at any time. Msg & data rates may apply. Consent is not a condition of purchase.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.